The Reserve Capacity mechanism is intended to ensure that the South West Interconnected System has adequate installed capacity available from capacity providers, which includes generators, batteries and demand-side management options, at all times to:
- Cover expected system peak demand, including additional capacity to cover the failure of the largest system contingency and a capability to respond to frequency variations.
- Where applicable, ensure there is enough flexibility between the daily minimum and peak demand.
The Australian Energy Market Operator (AEMO) administers the Reserve Capacity Mechanism.
Benchmark Reserve Capacity Prices are set for each Capacity Year based on the expected cost of a new entrant building and connecting a battery to the South West Interconnected System and other costs required to make the facility capable of supplying electricity.
The ERA determines the value of the Benchmark Reserve Capacity Price consistent with the method specified in the Electricity System and Market Rules and the WEM Procedure: Benchmark Reserve Capacity Prices. This includes public consultation on the proposed values before the ERA determines the Benchmark Reserve Capacity Prices to apply in the capacity year.
From the 2025 Reserve Capacity Cycle (applying to the 2027/28 capacity year onwards), the ERA must determine both a Peak Benchmark Reserve Capacity Price and a Flexible Benchmark Reserve Capacity Price.
2028-29 capacity year
Final determination
File Attachment
Draft determination and submissions
2027-28 capacity year
Final determination
19 Dec 2024
File Attachment
Draft determination and submissions
06 Nov 2024
2026-27 capacity year
Final determination
20 Dec 2023
File Attachment
Draft determination and submissions
04 Oct 2023
2025-26 capacity year
Final determination
21 Dec 2022
File Attachment
Draft determination and submissions
05 Oct 2022